Optimising Concrete Highway Paving: An Australian Perspective

James WalkerHiawatha

AUTHOR: Walker, J.

ABSTRACT: A typical Australian Highway pavement is 10 m – 10.5 m wide, consisting of 2.5 m nearside shoulder, 2 x 3.5 m travel lanes and an offside shoulder of 0.5 m – 1.0 m. For many of these high speed - high volume - high heavy vehicle usage corridors, rigid pavements are the workhorse that provide durable, low maintenance, longer lasting roads. Current construction practices and Transport for New South Wales (TfNSW) – the State Road Authority for New South Wales, Australia, Standard Drawings would see the paving of travel lanes and offside shoulder in first pass utilising multi-lane paver and tipper trucks. Following the first pass gaining strength, the shoulder would be paved with smaller paver and concrete delivered with tipper trucks or agitators. Proposals to construct the full width of pavement as a single pass have been raised by many over the years. Modern high output twin shaft mixing plants have been utilised in Australia since the turn of the century, making it possible to pave full width in single pass. With Australian Road Agencies seeking to improve road safety outcomes for all, there has been ongoing calls for increased nearside shoulders to ensure they can function as a breakdown lane, with shoulder widths as wide as 4 m. This would result in a cross section up to 12 m. While this represents a huge improvement for road safety, it also raises the need to reconsider the case for full width concrete paving. Particularly when one considers potential benefits:
• Safety during paving operations
• Construction quality
• Potential paving program efficiencies, and
• Potential cost savings

James Walker is a Civil Engineer working on the development and delivery of major road infrastructure projects with Transport for NSW. With experience in the design and construction of highway concrete pavements, including widening of the M1 Motorway (between Sydney and Newcastle), James has recently commenced the role of Vice President with the Australian Society for Concrete Pavements.
Wed 10:15 am - 12:00 pm

Categories:

Tags:

Comments are closed